Major Projects

A wide variety of projects have been completed to the satisfaction of the Customer. Projects include:

 

Thomas Foods International, Menindee, New South Wales

Fruit Orchard venturing into Potatoes irrigated by Centre Pivots.

  • Replaced existing system with fully automated system utilising ABB HMI, PLC and Variable Speed Drives.

 

 


 

Macquarie Horticultural Developments, Robinvale, Victoria

Large scale irrigation of Almonds, with multiple 355 kW River pumps, multiple 355 kW Relift pumps and field valve automation using Telemetry control.

 

 


 

Northern Citrus – Hillston, NSW

  • Install Radio Transmitted Unit (RTU’s) controlling valves on new plantings
  • Control of irrigation pumps and valves of four (4) stages of development, on farm from main office via telemetry.
  • Injection and control of fertiliser via Fertiriego System.
  • Automatic telephone dialler to alert operator of faults.
  • Set up remote access to control System.          

                 RTU                          Control Touch Panel

                               RTU                                                         Control Touch Panel

 

 


 

Best Bottlers – Mildura, Vic

Installation and commissioning of a wine bottling, labling and carton packing plant.

 


 

Almond Investments – Woodwood, Vic

  • Fully automate irrigation pumps controlled by (ABB) variable speed drives and modbus control at four (4) sites over 1000’s of acres of Almond development.
  • Level control of Dams.
  • Full view and control of all operation via colour touch panel.
  • Automatic telephone dialler to alert operator of faults.

 

 

Control Room Installation of two (2) 220kW Pumps

 

 


 

Qualia Wine Services – Irymple Vic

  • Maintenance
  • Upgrade of Tank Farms 2013 , 2011
  • Programming

 


 

Mildura Fruit Juice Australia – Mildura Vic

  • Maintenance
  • Upgrade of Plant Equipment 2013
  • Electrical Restoration following factory fire to full operation.
  • Programming.

 


 

Mildura Brewery, Mildura, Vic

Installation of second Bottling line and tank temperature controls installed in 2007

2014 Select Harvests - Wemen Project

2 x 200kW pumps Irrigating Almond Farm

 

Control Room   200kW Batescrew Turbine Pumps         Switch Board inside Control Room

              Control Room                                200 kW Batescrew Turbine                   Switch Board

                                                                                   Pumps                                         inside

                                                                                                                                 Control Room

Online Enquiry
Name
Phone
Email
Enquiry
* Required fields

x close